South Mills River Trail Reroute & Repair

South Mills River

The need On the Pisgah Ranger District, the trails in the South Mills River area suffered some of the most significant damage from the impacts of Hurricane Helene. With multiple […]

Invasive Plant Removal at Davidson River Campground

Invasive Plant Removal

Initial treatments The campground, which is managed by Naventure, is temporarily closed for bathhouse renovations. The closure provided an ideal window for Naventure to contract our Ecological Restoration Crew to […]

Old Lanning Ridge Trail

We contracted the team from Elevated Trail Design (based in WNC) to rehabilitate this .325-mile legacy trail to reestablish it as a sustainable system trail and connect these two popular […]

West Fork of French Broad River Dumpsite Cleanup

Tires and trash filling a dumpster

A continued tradition of winter cleanups:  After cleaning up a major dumpsite along Tucker Creek in 2022, and another dumpsite at a former transfer station off of Macedonia Church Road […]

Tanasee Gap Dumpsite Cleanup

Volunteer standing by waste pile

A continued tradition of winter cleanups: In February 2024, in what has now become an annual tradition, The Pisgah Conservancy collaborated with Headwaters Outfitters and the U.S. Forest Service on […]

Invasive Plant Removal at Kuykendall Group Campground

The perimeter before

Initial treatments In Spring 2024, our Ecological Restoration Crew began performing non-native invasive plant assessment and treatment as outlined in the Catheys Creek Watershed Restoration Action Plan (WRAP), a holistic […]

Exercise Trail Relocation (2024)

Exercise trail fully graveled

Moving and restoring the trail: The TPC Trail Crew constructed two new sections of turnpiked trail to bypass two trail sections that were heavily impacted by Tropical Storm Fred. The […]