Happy October from our crew!
Your donations and license plate purchases help all of us at The Pisgah Conservancy continue our work to meet the greatest needs of the forest.
Keep reading to see the impact you’ve helped make, what’s coming up, and how you can get involved.
This month’s highlights:
- In case you missed it – we’re hiring an Executive Director! View the full job description here.
- The Upper Falls Connector Trail is now open!
- We have four upcoming volunteer days (see details and register here)
- We put our new graffiti sandblaster to work at Whaleback Falls
- Our Trail Crew is addressing extensive maintenance needs on Caney Bottom Trail and Cove Creek Trail
- Our Ecological Restoration Crew is continuing invasive plant removal, addressing a major landslide, gathering white oak acorns to support reforestation efforts, and more
- Restock alert… our hats are back in stock at D.D. Bullwinkel’s Outdoors in Brevard!
Trails we’ve worked on in the past month:
- Pink Beds Connector Trail
- Caney Bottom Trail
- Slick Rock Falls Trail
- Art Loeb Trail
- Andy Cove Loop Trail
- Sycamore Cove Trail
- Daniel Ridge Trail
Trail Crew Highlights
Caney Bottom and Cove Creek Trails:
With projects recently completed on Cat Gap Loop Trail and the Pink Beds Connector Trail, our Trail Crew has moved on to the Caney Bottom/Cove Creek Trail complex to focus on overall trail improvements, addressing damaged or deteriorated sections and restoring effective drainage.
Our Trail Crew began work on Caney Bottom Trail with a full run of heavy brushing, clearing overgrown vegetation along the footpath to open it up for easy passage and to get a better look at needed trail improvements across the entirety of the trail.
With brushing complete, they are now turning their focus to drainage, a maintenance necessity and the key component to the longevity of Pisgah’s trails. In addition to improving existing drainage structures, the crew has been digging new drains, removing berm, and restoring outslope to encourage sheet flow and prevent erosion on the trail and sedimentation in Caney Bottom Creek.
To address sections of trail rutting and more significant entrenchment, the crew is constructing locust check steps and unified locust ladder staircases to restore and retain trail tread in these impacted areas.
Ecological Restoration Crew Highlights
Invasive plant removal
This past month, our Ecological Restoration Crew has continued work in the North Mills River Watershed along Wash Creek Road using cut-stem methods to tackle infestations of mature autumn olive and other invasive species.
The upper part of this road hosts dense woody thickets that will require special attention with heavy chainsaw work. This 30-acre area will take a lot to tackle this fall and winter, and our crew is making great headway.
Major landslide repair
Our Ecological Restoration Crew, with support from members of our Trail Crew, recently addressed a major landslide that was caused by Hurricane Helene. The landslide is located next to Otter Hole in the South Mills River Watershed, along South Mills River Trail.
To repair the slide, they covered the damaged area with coir matting and reseeded it with native plants, which will hold the soil in place until woody shrubs regenerate. But their work isn’t done yet.
The crew will return this winter to add roughly 100 live stakes of riparian buffer species at the toe of the slide. This will enable deeper roots to stabilize the stream bank and provide more resilience for future weather events.
White oak reforestation
With the season upon us, our Ecological Restoration Crew assisted Forest Service silviculturists with gathering white oak acorns for reforestation efforts. Every two to five years, oak species have a mast year, where they produce an exceptionally large crop of acorns all at the same time to cover the forest floor; they go nuts, so to speak.
They took advantage of this and were able to gather 100 pounds of acorns! These acorns will be grown up to seedlings and planted in reforestation efforts and, when mature, will provide food and habitat for the hundreds of different species they serve ecologically.
Hemlock treatment demonstration
Members of our Ecological Restoration Crew attended a demonstration of chemical treatment methods to control the invasive hemlock woolly adelgid hosted by the Hemlock Restoration Initiative (HRI) at Asheville Botanical Gardens.
Opportunities like this help our crew develop exposure to new skills and techniques, build a strong network among like-minded restoration technicians, and remain informed and up to date on their NC Pesticide Applicator licenses.
Community Outreach & Education highlights
Graffiti removal at Whaleback Falls
This summer, we received reports of graffiti on a rock wall at the beloved Pisgah swimming hole, Whaleback Falls. Members from our Ecological Restoration Crew and Trail Crew worked together to assemble and test our newest tool, a sandblaster for non-chemical graffiti removal. The purchase of this new tool was supported by a generous grant from the Hathway Family Foundation.
The sandblaster uses a combination of glass sand made from recycled materials and water sourced on site to remove the graffiti without introducing harsh chemicals into the environment.
Our friends at Wild South shared information on how to assemble this tool to address graffiti issues in the front and back country. We were very pleased to see it work like a charm on the Whaleback Falls graffiti and will use it on other sites throughout the District!
If you encounter graffiti while adventuring in the Pisgah Ranger District, please report it to us by emailing [email protected].
Educational programming with local school groups
As school is back in session, we are excited to offer fall educational programming for the very first time.
Our Community Outreach Coordinator hosted a homeschool group in the forest for a macroinvertebrate food webs lesson, and students got the chance to net and closely observe the aquatic insects that call the Davidson River home.
She also visited Rise and Shine’s afterschool program, where students learned about hellbender adaptations and what makes a healthy hellbender habitat.
Major Project Updates
The Upper Falls Connector Trail is now open!
On October 6th, we held a ribbon-cutting ceremony in partnership with the Forest Service and the National Park Service – Blue Ridge Parkway to celebrate the completion of the new Upper Falls Connector Trail. This new trail is now open to the public!
The new 1-mile trail connects the John Rock Overlook parking area to the Graveyard Fields valley floor, creating an access route for future trail repairs, habitat and stream restoration, storm recovery, and ongoing maintenance.
The project was supported by a partnership with the Forest Service and the National Park Service – Blue Ridge Parkway.
This project was made possible through generous contributions from the Lastinger Family Foundation, Visit Haywood, Fernandez Pave-the-Way Foundation, Blue Ridge Parkway Foundation, Community Foundation of Henderson County – Perry N. Rudnick Endowment, Carol B. Phelon Foundation, and donors to The Pisgah Conservancy.
Upcoming project: South Mills River Trail
With the Upper Falls Connector Trail completed successfully, our focus for contracted trail projects is shifting to South Mills River. This past month we held our pre-bid meeting for interested contractors at the project site, taking a group of skilled trailbuilders into the woods to see the scope of the project.
Beginning at the Turkey Pen Gap trailhead, this project consists of trail maintenance, trail widening, trail relocation, and armored ford construction on the first four miles of South Mills River Trail and the relocation of a .25-mile segment at the beginning of Bradley Creek Trail.
Repair and improvements to these trails are crucial components of Hurricane Helene recovery in the Pisgah Ranger District. This work will result in more resilient trail infrastructure and will provide reliable access for upcoming Forest Service contract work to replace three destroyed suspension bridges in the area.
Recent events
National Public Lands Day: We had a great turnout at our National Public Lands Day event in late September with 78 volunteers supporting 8 projects.
- Members of our Ecological Restoration Crew led non-native invasive plant removal projects at the Art Loeb Trailhead and around the Pisgah Visitor Center.
- Our Trail Crew teamed up with the Carolina Climbers Coalition and the Pisgah Cowboys to lead multiple trail maintenance projects at locations along the Highway 276 corridor.
- Transylvania County Extension Master Gardeners worked with volunteers to mulch and tend the Pisgah Visitor Center gardens, readying the beds and tucking them in for a winter’s rest.
Thanks to all the volunteers who spent their Saturday with us to make our public lands better for all!
Veterans Fish Day: Members of our Trail Crew and Ecological Restoration Crew lent a helping hand to Forest Service staff at Veterans Fish Day. Friends from the Western NC Veterans Affairs joined in to catch catfish, eat great BBQ, and enjoy the outdoors. Thank you to the WNC Muskie Club and the Pisgah Ranger District Biologist for making this event happen, and to the NC Wildlife Resources Commission for hosting it. We are very grateful to honor the veterans in our community for their service.
We’re searching for our next Executive Director
The Pisgah Conservancy seeks an Executive Director to build on ten years of impact, strengthen our partnership with the Forest Service, and expand the philanthropic support that helps Pisgah thrive.
Interested? Applications are open through November 1 at potrerogroup.com/tpc. To share candidate recommendations or for additional information, please contact Jena Kuznik, Senior Consultant, Potrero Group, at [email protected].
Enter to win this bike!
The 2026 Pisgah Project Raffle Bike features a hand-built steel Hall Pass frame from REEB Cycles. Paired with Cane Creek Cycling Components’ HELM suspension fork and eeWing Titanium cranks, an Industry Nine carbon wheelset, and a carefully selected lineup of components from premium partners, this bike is built to explore Pisgah’s backroads and beyond — with durability, performance, and purpose at its core.
See the full build and get your tickets today: https://bit.ly/4AbTRpP
It’s not too late to see the bike in person!
- Weevil Outdoor (Pisgah Forest, NC): October 22nd – 25th
- Motion Makers Bicycle Shop (Asheville, NC) – October 26th – 29th
- Trailside Brewing (Hendersonville, NC) – October 30th – November 4th
- Winner will be announced on Thursday, November 5th
Volunteer with us
Cooler temperatures are here, and it’s the perfect time to volunteer with The Pisgah Conservancy! We have four upcoming volunteer opportunities, and we’ll be adding more dates for early 2027.
- Wednesday, November 4 – Invasive Plant Removal Workday (link)
- Wednesday, November 18 – Invasive Plant Removal Workday (link)
- Wednesday, December 2 – Invasive Plant Removal Workday (link)
- Wednesday, December 16 – Invasive Plant Removal Workday (link)
Pisgah Bridge Adventure Challenge
Thank you to everyone who hit the trails this summer to complete the Pisgah Bridge Adventure Challenge! In late September, we gathered at Ecusta Brewing to celebrate our challenge finishers.
Congratulations to Kathy Johnson, who was randomly selected as the winner of a two-night stay at Pilot Cove!